Project details
Our studio brings in external specialists during busy production periods. Review twelve months of meter readings and survey the main loads. Rank improvement options by estimated savings, cost and disruption. Please include a proposed schedule and identify any decisions that need approval before work starts.
What to include in your proposal
Outline the first deliverable, the inputs you need and how the client can check the result. Separate the work included in the budget from optional additions.
